Documents · Credits
How credits work
The one currency for every paid run: priced per model, quoted first, never charged above the quote, and never expiring.
Credits are the one currency across Aiora Labs. Each paid run costs credits, and the price depends on the model and the settings you choose: resolution, duration and how many outputs you ask for. One balance serves every tool, so a Playground image, an A-MAX shot and an Aiora Code turn all draw on the same credits.
What a credit is
A credit is the unit your balance and every price are counted in. Credits are bought at 140 credits per US$1, with a bonus on larger top-ups (see [Top-ups and bonus bands](/docs?a=credits-topups)). A new account starts with a one-time allowance of welcome credits, so you can try a run before you buy anything.
Where credits come from
What costs credits, and what does not
- **Costs credits**: generating images, video, music, voice and sound in [Playground](/playground); generating shots, audio and the AI director’s script in [A-MAX](/a-max); clipping long videos with /clip; Aiora Code turns; and paid steps Kairo runs for you. Kairo always asks first before anything quoted at 50 credits or more; see [Permissions and approvals](/docs?a=agent-ora-approvals).
- **Free**: browsing, reading the documentation, building an A-MAX storyboard from your own script, taking a frame from a video, saving and organising [Media](/media), and moving work between tools. Sending a result to the Editor or the Scheduler prepares it there; nothing is charged until the destination asks you to confirm.
What a run costs
Prices are live, so they are not written down here. The [Models directory](/models) shows each model’s base price, and the Run button in a tool shows the price for your exact settings before anything is charged. Changing the model, the length, the resolution or the number of outputs changes the quote straight away.
Cheaper first drafts: Explore with a shorter duration, a lower resolution or a single output, then spend on the version you like. In A-MAX the Draft tier routes shots to lower-cost models for the same reason.
Quote, reserve, settle
- You see a credit quote first. A quote is not a charge, and it lasts five minutes.
- Confirming reserves the quoted amount. Your balance shows it as reserved, not spent.
- When the run finishes you are charged what it used, never more than the quote, and the rest is released. A failed or cancelled run releases everything.
More detail, including every ledger entry this produces, is in [Reservations and settlement](/docs?a=credits-reservations).
Reading your balance
[Account & finance](/credits) opens on a summary of three figures:
The balance in the top bar changes colour when fewer than 20 credits are available. A run that would cost more than your available balance cannot be reserved, so it is stopped before it starts, never part-way through.
Common questions
Can a run cost more than its quote?
No. The quoted credits are the most a run can be charged. If it uses less, the difference is released back to your available balance.
Why is my available balance lower than my total?
Something is still running and holding its quoted credits. When it finishes, the hold becomes a charge and anything unused comes back. The [Ledger](/credits?tab=ledger) lists each hold.
Do membership credits and bought credits behave differently?
Both are spent the same way on the same runs, and neither expires. Bought credits stay yours if a membership ends; see [Refunds and failed runs](/docs?a=billing-refunds).
Credits do not expire: Nothing in your balance has an expiry date. [Account & finance](/credits) shows your reserved and total credits separately.
- Account & finance: Balance, plans and the ledger.
- Ledger: Every charge, release and grant, itemised.
- Models directory: Base prices for every approved model.
- Pricing: Plans and live top-up quotes.
- Credit Terms: The formal position on credits.